The Solution
DuPont Danisco partnered with RMR Process to design and implement a state-of-the-art powder blending facility. RMR Process was selected after a thorough evaluation of various food specialty design and construct companies, as they were found to be "closest to the high standards" DuPont Danisco was seeking to achieve.
The solution delivered by RMR Process included:
Specialized Facility Design: A three-story, highly specialized, high-care powder blending facility
Innovative Construction Approach: Building the new facility inside an existing operational warehouse at Erskine Park, Sydney
Process Optimization: Redesigning manufacturing workflows for maximum efficiency within a smaller footprint
High-Care Environment: Implementing advanced food safety systems to exceed regulatory requirements
Project Management Excellence: Overseeing the entire project from design through execution to start-up
Case Study:
DuPont Danisco
The Challenge
DuPont Danisco, a global food ingredients company, faced significant operational constraints that were limiting their business growth:
Facility Limitations: Their existing Banksmeadow facility in Sydney's south had been outgrown and could no longer support their production needs
Volume Constraints: The company needed to achieve higher production volumes to meet market demand
Food Safety Requirements: Increasingly stringent food safety standards were becoming difficult to meet in their aging facility
Operational Efficiency: The existing facility had an unnecessarily large footprint with inefficient processes
Market Adaptability: Limited capability to handle a wider scope of ingredients restricted their ability to enter new markets
These challenges were hindering DuPont Danisco's ability to grow and adapt to changing market conditions, potentially threatening their competitive position in the food ingredients sector.
The Results
The partnership with RMR Process delivered transformative outcomes for DuPont Danisco:
Footprint Reduction: Achieved a 60% reduction in facility footprint while maintaining a similar manufacturing process
Increased Throughput: Realized a 27% increase in throughput per hour
Resource Efficiency: Dramatically reduced energy and water use per kilogram of product
Market Expansion: Gained capability to handle a wider scope of ingredients, opening up new market opportunities
Operational Agility: Became more flexible and agile as a manufacturer, better positioned to adapt to changing market needs
Enhanced Safety: Created a facility that is easier to manage from a safety and serviceability perspective
Key Takeaway
DuPont Danisco's experience demonstrates how strategic facility design and process optimization can transform manufacturing capabilities, enabling significant business growth while simultaneously reducing operational footprint and resource consumption.
"We connected with various food specialty design and construct companies, viewed all their finished works and found RMR to be closest to the high standards we were seeking to achieve." - Glen Robson, Manufacturing and SHE Leader, Danisco Australia